'Estimates' of my stories in Portfolio does not change when I assign story points in backlog?

Jeroen Thoelen
Contributor
December 7, 2017

Hi,

If I, in the backlog, change my story points, this is not updated in Portfolio, estimates does not change?

Is that possible?

 

THanks,

 

Jeroen

1 answer

0 votes
Amanda {Praecipio}
Contributor
December 28, 2017

Hi, Jeroen! 

There's a great thread about this problem here: https://community.atlassian.com/t5/Jira-questions/Story-points-are-not-synchronized-in-Portfolio/qaq-p/189113/jump-to/first-unread-message

If that does not apply to you, there are a few other things that could be happening. 

If the Story is Resolved or Closed, the Plan won't update the estimate. If you've changed the Story Points field on the Epic, it won't update. Portfolio does not recognize changes to the field on that issue type (this has been the behavior since 1.x).

If you're changing it on the Story, and looking for it in the Plan, clicking the calculate button should pull that estimate in (provided the above things are false). 

Suggest an answer

Log in or Sign up to answer
TAGS
atlassian, team ’25 europe guide, teamwork collection, atlassian events, conference guide, team culture, collaboration tools, ai in teamwork, atlassian learning, event schedule, keynote previews, community events

Must attend events for Team Europe '25!

Make the most of your time in Barcelona with our curated guide – discover how Jira, Confluence, Loom, and Rovo work better together, connect with Atlassian experts, and enter to win an Apple prize bundle!

Get the guide
AUG Leaders

Atlassian Community Events