Dear All,
i want to set a scheduled automation to check the issue that has a linked issue, and if all the linked issue are done, then transition the issue. can we make it possible? i have the JMWE add on, if it's needed.
Thankyou
Hello @Nicolas Andika
Yes, that is possible.
Can you provide more detailed information about your scenario?
Do you want to do that for a specific link type? If so, which link type?
And which side of the link relationship do you want to close?
For example, if issues are linked by the blocks/is-blocked-by relationship would you want to close only the issues that are is-blocked-by other issues?
I already try with my own and i also have found out how to make it possible, thanks to the attention
Regards,
Nico