Is it possible to make story points a required field before moving something to "done" on a single project?
All of our Engineering teams utilize the same workflow, therefore I know my solution cannot be within that workflow. Looking to see if maybe there is a way utilizing automation? Or something else?
Hi @Paula Pokusa , yes indeed. You can achieve this using schemes specifically the field configuration needs to be associated with the field configuration scheme and then associate this scheme with the project. Basically you use 'project specific schemes'.